I know we’ve all had them and try to avoid them but unfortunately the weather for the riding season aligns with all other outdoor activities. Quick lead-up. We had a pond roughly 12’x12’ and about 5’ deep. There was a waterfall about 25’ into the pond. All this was built with boulders and flagstone before we moved into the house. Every year it needed more and more and the cleaning was a total PITA. This year was the year something had to be done and I knew it was going to be either a total expensive make-over or the option to delete it however I was having a hard time deciding because when it was clean and nice it was awesome to sit and listen to. I was talking with a friend who is a landscape architect and his take was that it had run its course and he said he would sketch something up for me. Well I liked what he showed me so the demolition began. Every rock had to be removed for the new design.


I had 6 yds of fill sand delivered and because I’m a cheapass and didn’t want to pay for two days rental of a plate compactor I wheelbarrowed all 6 yds from the street to the back yard, stopping every 6-8” of fill to compact it. Over the next couple weeks I arranged boulders and began filling with gravel for my base.

keep in mind I still had other things going on besides this project but it took the lion share of my time. Once the base was done I started in on the flagstone. The idea was to re-use as much existing material as possible. I was able to get three of the six stair landings done with existing stone but still needed more. I ended up purchasing 5 more tons of flagstone.

I have to admit I have never worked with stone before and to be honest I don’t care if I never have to again as it’s super heavy and dirty. It took about 3 1/2 months and probably close to 250 hrs but I did it totally on my own with no help lifting or moving anything. A strap a hand truck and taking my time got it done. The main cost was only getting out on the bike a few times this summer. Looks like I got some making up to do next year.




I had 6 yds of fill sand delivered and because I’m a cheapass and didn’t want to pay for two days rental of a plate compactor I wheelbarrowed all 6 yds from the street to the back yard, stopping every 6-8” of fill to compact it. Over the next couple weeks I arranged boulders and began filling with gravel for my base.

keep in mind I still had other things going on besides this project but it took the lion share of my time. Once the base was done I started in on the flagstone. The idea was to re-use as much existing material as possible. I was able to get three of the six stair landings done with existing stone but still needed more. I ended up purchasing 5 more tons of flagstone.

I have to admit I have never worked with stone before and to be honest I don’t care if I never have to again as it’s super heavy and dirty. It took about 3 1/2 months and probably close to 250 hrs but I did it totally on my own with no help lifting or moving anything. A strap a hand truck and taking my time got it done. The main cost was only getting out on the bike a few times this summer. Looks like I got some making up to do next year.