My 81' "Bratt" build

Got the covers all polished & on, the side mount plate on, shift & brake linkage done & kickstand shorted for a final time and on. Also, striped and primed the tank. Now just need to figure out who will paint it and it will be done. Sure!
[/IMG]
[/IMG]
[/IMG]
[/IMG]
[/IMG]
 

Attachments

  • 3-5-12006.jpg
    3-5-12006.jpg
    125.1 KB · Views: 2
  • 3-7-122002.jpg
    3-7-122002.jpg
    140.4 KB · Views: 2
  • 4-3-12004.jpg
    4-3-12004.jpg
    103.4 KB · Views: 2
  • 4-3-12001-1.jpg
    4-3-12001-1.jpg
    114.8 KB · Views: 2
  • 3-27-12018.jpg
    3-27-12018.jpg
    88.1 KB · Views: 2
Last edited:
I am REALLY liking this build. I picked up my first XS a month or two ago. Right now I just want it running. But I haven't gotten a clear picture of how I want the finished product to turn out. However, this is nearly what I am thinking! Really nice. I can't wait to see it all together.
 
Thank you. I also cant wait for it to be done.:)
The painter I had set up fell through. So, now I need to figure out what I am going to do with that. I have painted before but it is not my favorite thing to do. Hopefully I figure it out soon.
 
Last edited:
Wow... loved everything up to the....

Was this ever finished?

Yes it was. I have been out of it. I have not been on here for a while. I posted the pics that I have. I need to get it out and cleaned up to get some good shots of it. Turned out how I wanted it to more or less. Now I know what to do on the next one. :thumbs-up:

5-23-12004.jpg


When I got the tins back.

5-29-12015.jpg


On the lift getting finished up.

5-29-12016.jpg


5-29-12021.jpg


5-29-12024.jpg


Done!
 
Back
Top