Mine will be getting built shortly, all work will be done by me at home with the exception of the re-bore & bead blasting.
New rods & all 4 bearings in crank new + re-phase to 277, re-bore .050 & new pistons, new g/box bearing kit + recon g/box, Pam-co 277 ignition kit (minus advance - will re-use mine with new spring kit), Mr-Riggs 277 re phased cam, new valves (still undecided if I will install the new SS ones I have or install the refaced originals yet) both cam-chain guides, cam-chain, bolt kits (top & bottom) all cases bead blasted, Punkskalars PM conversion kit, new gasket & seal kit, new oil pump, Heiden XR oil filter/cooler conversion, starter eliminated, new cam bearings, elephant foot rockers, 1 piece clutch push rod, new sump filter with shroud, new spark plugs, washer kits (top & bottom end)
Carbs will be bought soon probably a new VM34 kit & exhaust will be Omars 1/2 mile system.
The frame,wheels,bodywork etc is another story.
Thats all I can think of now..?? Will add if I think of anymore....
Cheers.