Almost a month has gone by since my last update.
Haven't had much time to put into the bike been a bit busy doing other things. The laptop I do all my drawings on died the only stuff that was not properly backed up was the drawings. Fortunately I had a paper copy of the wiring diagram that I had printed off for checking.
The wiring is 95% finished now, it is a very time consuming job and ended up a bit cramped under the seat. The wires in the headlights did eventually fit. Just need to go through and check the ignition wiring and put a couple of plugs on.
My intension is to sort the clutch and brake MC's out next and work on some offset sprocket arrangement to give some more chain to tyre clearance.
Haven't had much time to put into the bike been a bit busy doing other things. The laptop I do all my drawings on died the only stuff that was not properly backed up was the drawings. Fortunately I had a paper copy of the wiring diagram that I had printed off for checking.
The wiring is 95% finished now, it is a very time consuming job and ended up a bit cramped under the seat. The wires in the headlights did eventually fit. Just need to go through and check the ignition wiring and put a couple of plugs on.
My intension is to sort the clutch and brake MC's out next and work on some offset sprocket arrangement to give some more chain to tyre clearance.