I have this image in my head of peanut going out to his new man-cave,
And discovering all his tools spread out on the bench,
Sorted shortest to longest.......
Hey Airwolfie!!
- mount front fender------1hour
- mount number plate-------2 hours
- wire entire bike-------4 hours
- mount rear brake switch------1 hour
- add oil------1/4 hour
- add fuel------1/4 hour
- run engine-----timeless
- torque engine bolts-----1hour
- tune engine------1hour+
You are so close to being ready to ride.
You are much closer than Peanut is to filling his shed with cool stuff.
Drink a pint and get to it Son I can hardly wait!
Yeah AW get cracking ... we are running out of popcorn !
You don't need to paint your pipes and fit a fender to start her up and get an MOT . Have you got a wiring diagram yet ?
well done mate thats excellent progress.
I know the wiring might seem a bit daunting but there are lots of folk on here ready to help .Easiest way to start is probably to print out the original wiring schematic and erase all the things you don't want and start from there .
Alright Airwolfie that's the way
Yep Ya can do the wiring.I know Ya can!
Just do one system at a time.
Hey Airwolfie!!
- mount front fender------1hour
- mount number plate-------2 hours
- wire entire bike-------4 hours
- mount rear brake switch------1 hour
- add oil------1/4 hour
- add fuel------1/4 hour
- run engine-----timeless
- torque engine bolts-----1hour
- tune engine------1hour+
You are so close to being ready to ride.
You are much closer than Peanut is to filling his shed with cool stuff.
Drink a pint and get to it Son I can hardly wait!
Airwolfie!
Another one bites the dust!
now You got 40 minutes to mess with something else
Keep on trucking!
yep you're on a roll Airwolfie.
Surprising how quick and easy some jobs turn out when you've been putting them off.
I still think you are going to have yours running and MOT'd before mine.