Trying to keep moving! I want to work in it 24/7 lol... But i have alot of like 5 min spurts in between waiting for glue to set up and things... So i grab the wire wheel and clean for 5 mins at a time!
Im still thinking about the swingarm. But im def gonna run it the way i have it for a little while at least....
Still weighing making my own chomoly vs radian vs my own aluminum... Im half tempted to pick up a frame jib this winter and start over on a frame... full chromoly... lol